RFT floors in typical office spaces allow
for the installation of partitioning
systems on the raised floors directly,
greatly reducing wastage in both
floors and partitioning systems.
Perimeter Conditions
At perimeters, panels are cut on site
and are installed using standard
system components. The minimum
gap of 5mm left for expansion is
covered by skirting (by others).
Step Detail
The construction of a sometimes
necessary step is straightforward and
made of readily available materials in
any local market.
Bridging Method
Obstacles that prevent the placement
of a pedestal in necessary locations are
sometimes encountered. A "bridging"
construction is created from standard
system components.